{"id":1388,"date":"2018-10-16T04:04:00","date_gmt":"2018-10-16T04:04:00","guid":{"rendered":"https:\/\/csbattery.cn\/?post_type=projects&#038;p=1388"},"modified":"2023-02-23T14:32:49","modified_gmt":"2023-02-23T14:32:49","slug":"cs-battery-project-in-shanghai-2018","status":"publish","type":"projects","link":"https:\/\/csbattery.cn\/fr\/projects\/cs-battery-project-in-shanghai-2018\/","title":{"rendered":"Projet de batterie CS \u00e0 ShangHai 2018"},"content":{"rendered":"<p><strong>Nom du projet:&nbsp;<\/strong>Syst\u00e8me de stockage 100KWH<\/p>\n\n\n\n<p><strong>Type de projet:&nbsp;<\/strong>&nbsp;Syst\u00e8me d&#039;alimentation de secours du centre de donn\u00e9es<\/p>\n\n\n\n<p><strong>Pays d&#039;installation\u00a0:&nbsp;<\/strong>Chine Shanghai<\/p>\n\n\n\n<p><strong>Ann\u00e9e d&#039;installation\u00a0:&nbsp;<\/strong>juillet 2018<\/p>\n\n\n\n<p>En 2018, CS Battery propose une batterie durable GB12-150 (12V150h) pour le syst\u00e8me d&#039;alimentation de secours du centre de donn\u00e9es (240KW)<\/p>","protected":false},"featured_media":3783,"template":"","class_list":["post-1388","projects","type-projects","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/csbattery.cn\/fr\/wp-json\/wp\/v2\/projects\/1388","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/csbattery.cn\/fr\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/csbattery.cn\/fr\/wp-json\/wp\/v2\/types\/projects"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/csbattery.cn\/fr\/wp-json\/wp\/v2\/media\/3783"}],"wp:attachment":[{"href":"https:\/\/csbattery.cn\/fr\/wp-json\/wp\/v2\/media?parent=1388"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}